Electrical Testing

OUR SERVICES

Electrical Testing

Generator Protection Relay, Transformer Protection Relay, Feeder Protection, Primary Injection Test, Secondary Injection Test, Pickup & Dropoff.

A protective device that monitors the generator’s operating conditions and isolates it during faults or abnormal conditions to prevent damage.

  • Protects against overcurrent, over/under-voltage, over/under-frequency, and reverse power.
  • Detects faults like rotor earth faults, stator winding faults, and loss of excitation.

Generator Testing

Stator test

  • IR & PI Test
  • Winding Resistance Test

Rotor test

  • IR test
  • Winding Resistance Test

Exciter testing

  • IR Test
  • Winding Resistance Test

PMG testing

  • IR test
  • Winding Resistance Test

Diode testing

Discharge Resistor testing

RTD testing

Generator Protection Relay Testing

  • Relay Setting Verify As per  Setting File
  • Relay Protection Testing As per Relay Setting File.
  • Protection Interlock Checking As per Approved  Drawing.
  • Relay Binary Output & Input Checking As per Relay Logic File.
  • Relay Led Check As per Relay Program
  • Tripping scheme  checking
  • Secondary injection test  via omicron kit  
  • Simulation tests
  • Hardware tests
  • Configuration checks

LASCCTPT Panel Testing

  • Current Transformer Test
  • Potential Transformer Test  
  • Lighting Arrester Insulation Resistance Test
  • Capacitor Insulation Resistance Test.
  • Excitation Transformer Ratio/IR/WR Test.
  • Bus bar Insulation Resistance Test

CT & PT Testing

 CURRENT TRANSFORMER TESTING

  • Checking tightness of CT connection.
  • Polarity test.
  • Resistance Test.
  • Primary injection test for ratio and circuit checking.
  • IR value checked primary and secondary side.
  • Knee point voltage Test only for PS class CT.

 POTENTIAL TRANSFORMER TESTING

  • Checking Tightness of Earthing connection.
  • Resistance Test.
  • IR Test of primary winding by HV megger between winding and Earth.
  • IR Test of Secondary winding by LV megger between winding and Earth.
  • IR Test of Secondary winding by LV megger between core to core
  • PT Phase sequence check.
  • Ratio and circuit test.

RMP & Sync. Panel Testing

  • Synchronizing Panel testing
  • GPR testing
  • Auto sync relay testing
  • Tripping scheme checks
  • Synchronizing scheme checks
  • Back charge test
  • Interpanel tripping test
  • Auxiliary relay testing
  • Functional test

NGR Panel Testing

  • CT testing
  • Resistance checks
  • Functional test
  • Operational checks

Circuit Breaker Testing

  • Opening & closing time of each pole by SCOPE MAKE digital equipment.
  • Insulation resistance check of each pole by megger.
  • Contact resistance of each pole by SCOPE MAKE digital equipment.
  • Mechanical & electrical operation check on test and service position as per drawing.
  • Closing & tripping from local & remote commands.
  • closing coil & tripping coil resistance checked.
  • Check on spring charging motor.
  • Check of correct operation of limit switches and time of charging.
  • Check Anti Pumping Coil Interlock Checking.

Motor Testing

  • Insulation resistance test
  • Winding resistance test
  • Direction of rotation
  • No load current measurements
  • Load current measurements

Transformer Testing

  • Insulation resistance test
  • Winding resistance test
  • Magnetizing current  test
  • Vector group  test
  • Transformer ratio test

Auxiliary relay Testing

  • Master trip relay testing
  • Voltage pick up & drop off
  • Contact and coil checks
  • Flags checking
  • Functional checks
  • Rotor e/f relay testing
  • Stator e/f relay testing
  • Auto sync. Relay testing
  • Stand by e/f relay testing